Using the Review System

Using the Review System

Reviewing an inspection allows you to check the work meets your required quality criteria. This is different from Approvals which is signing off, and locking the inspection records (see ‘Using Approvals’ for more information on this). 

The Review System allows you to set a percentage of all work in a Work Package that must be reviewed. 

When an inspection is finished (completed and all reports generated) the system decides if that inspection should be added into the list for review.

Reviewed inspections can be edited or re-activated as part of the review, or at any time afterwards.

Once an inspection has been reviewed and passed, the report will regenerate.  If you would like to have reviewer credentials entered into the report please talk to Clarinspect Support Staff to set this up.
Setting up the Review system

Go to Work Package settings, and click on Edit.


Review Percentage - You can change the percentage at any time. If you choose zero this is effectively turning the system off. Set the percentage you would like to be pulled into the Review Queue.


Workpackage Reviewers - These are people who can review the inspections. You can change reviewers at any time.


Once you click on Save Work Package then the review system will start checking newly finished inspections and deciding whether to add them to the review queue or not.

The Inspection list - All Inspections

Inspections that are in the review process show a badge in the status column.


An inspection that has been tagged for review will be:

  1. Green - Review passed
  2. Orange when finished (available for review)
  3. Grey when active or draft (tagged, but cannot be reviewed yet)

If you are a reviewer you can access the inspection from this list. 

If you do, you will be directed to the Review Page for that inspection.



If you use the Reviews tab you can mark inspections as passed, or click on them, check the data and reports, and then mark them as Passed.


In the Reviews tab you can tick several inspections at the same time and mark them as Passed.


On the Reviews tab you can:

  • Assign the inspection, and activate it for rework in the field.

    • You can add an optional note to go into the history.

  • Edit (and correct) an inspection (then report it again, and pass it).

  • Mark the inspection as Passed.


Review states

An inspection that has been tagged for review will be:

  • Green - Review passed

  • Orange when finished (available for review)

  • Grey when active or draft (tagged, but cannot be reviewed yet)


Reviews always pass - or the inspection is edited to fix a problem, or sent back out to the App and a member of staff for fixing. The other way out of a review is to cancel the inspection.



Key Notes

  • An Inspection cannot be Archived or Approved while pending or available for review.

  • Archived inspections that have passed review are included in the percentage calculation. 

  • Once an inspection has passed review, the report will regenerate. Contact Clarinspect Staff to enable reviewer credentials in reports. 

    • Related Articles

    • Using Approvals

      Once an inspection is approved it is uneditable. This stops data changing if it is going to be delivered to a client or an external database. Clarinspect can enable this feature for you. When they do, a new menu item appears in the Hub menu. This ...
    • Using Inspection Filters on the Hub

      Work Package Filters When you are looking at your Work Package view, you can use the filters on the right hand side to narrow down the amount of Work Packages you are looking at. You can filter by: Assigned user - this will show you all Work Packages ...
    • Removing Data Using a Bulk Edit File

      Removing Data using a Bulk Edit File To remove a field from your inspection, you need to delete the value from your spreadsheet before loading. There is a constraint that at least one other field for that inspection has a value, otherwise that row is ...
    • Using Clarinspect to Monitor a Project

      Clarinspect has a great feature where a person from outside a company can have free read-only access to monitor and view the progress of a project in Clarinspect. You will receive an invite to use Clarinspect, you need to "Accept the invitation” and ...
    • Using the Site Plan Tab on a Work Package

      Site Plans on a Work Package combine all annotations from work in a Work Package onto the site plans that were used on each and every inspection. This allows you to see a plan and then every piece of work, and where it was located, and how the plan ...