Using the Site Plan Tab on a Work Package

Using the Site Plan Tab on a Work Package

Site Plans on a Work Package combine all annotations from work in a Work Package onto the site plans that were used on each and every inspection. 


This allows you to see a plan and then every piece of work, and where it was located, and how the plan was marked up.


Until you have set the Zoom and text scale the drawing may look very crowded. Simply reduce the text scale, and zoom in to get the view you want.


Annotations for live work will change as the live work is updated. We recommend only re-arranging the annotations from finished work, as this does not change position!


The Site Plans Tab enables you to:

  • View all work for that Work Package

  • Move the annotations around for an improved view

  • Search by balloon text & automatic pan to location

  • Zoom in / out

  • Choose colour for display

  • Add new work to the current drawing directly

  • Add an annotated floor plan to any draft work that does not have a floor plan

  • Open a new tab for any inspection shown


When you have adjusted the picture to suit (zoomed, scaled and coloured) you can save or download the drawing.

 

Accessing The Site Plans Tab


The Site Plans Tab is found at the top of your Work Package if Site Plans have been used. For instructions on working with Drawing Sets read the Clarinspect guide "Loading Drawing Sets".



Elements of the Site Plans Tab

  


These are the sections to The Site Plans Tab:

  1. The Current Drawing: Here you can choose what drawing to view
  2. Rearrange Screen: Rearrange pins on drawing
  3. Choose Action: Download drawing/ visible area, copy drawing/visible area to clipboard, download as PDF)
  4. + -: Zoom in/out - You can zoom up to 150% of the original drawing size
  5. Add to Drawing: Add new or draft pin to drawing
  6. Filters: Filter what pins are visible by inspection type, state, who it is assigned to, date, inspection label
  7. Find Text Balloon: Find Text Balloon on drawing by looking through the list or searching the ID. This is especially useful if you have lots of pins! 
  8. Drawing Settings: Customise how your pins appear on the drawing through scaling balloon text, changing balloon colour, hide or show balloon arrows, merging balloons, and hiding annotation type of choice. 

Note: for a detailed guide on how to use the ‘Rearrange’ tool, see our user guide ‘Rearranging Text Balloons’ 


If the inspection is live and in use on the App, then the annotations may change or be moved, or be removed based on what the field staff do in the App.


In the Site Plans Tab you can move the annotations around. Click on the ends of text balloons, arrows and lines, and the drag handles for squares and circles. Changes are saved back to the Hub immediately after you make them.


Note: Changes on this screen do not affect the inspection data or report images.

Choose Action

From this menu you can

  • Download the drawing

  • Download the visible area

  • Copy the drawing to clipboard

  • Copy the visible area to clipboard

  • Download as PDF


Zooming 

Use the +/- controls to controls to zoom in and zoom out. 

Add to Drawing

This section is active only if a solution is chosen that can be added to a drawing. If the blue button is not disabled, click it to enter 'Add to Drawing Mode'.


Note: You can only add one inspection type at a time. 

If there are two inspection types on a work package, you need to deselect one (get rid of the blue tick when in Site Plans) before it will work.



When in Drawing Mode, the Filters, Annotations to Show and Find Text Balloons sections are hidden from view.

















The fields available in this section are set by Clarinspect when they configure the system for you. 

Note: The very top field is the one that will go into the text balloon of any created inspections added to the Drawing.

To add a new inspection

  1. Fill in the fields - the yellow prompting text will change.

  2. Click on the drawing - a balloon will appear pointing at where you clicked

    • You can click again if not quite placed correctly

  3. When you are happy click on 'Save Inspection'

  4. This will create a new inspection in the work package

    • It will have a floor plan and a text balloon

To place an existing draft inspection

If an inspection does not have a floor plan (for example if loaded from a schedule via 'Import CSV' on the Inspection List) then it will appear in the Draft inspections to add section.


Click the inspection in the list - this will fill in the fields on the form - then click on the drawing, and then the 'Save Inspection' button.

Filters

This section is used to choose what is shown on the selected drawing.





















Cancelled Inspections are never shown. Archived and finished inspections are included.

Tick the date box, and set the date to use in the filter, you do not need to set both dates. If you set only the ‘from date’ then you get all work completed since that date.


Note: Filters are applied immediately.


Note: Free-style shapes cannot be manipulated (moved) like the other shapes..


Top Tip : Set ‘Merge balloons within’ to 0 before applying filters.

This is found on the right hand side under Drawing Settings.

The annotations will appear more swiftly if the merging is turned off. 


Find Text Balloons

This section enables the user to locate a specific text balloon (inspection / feature). 

The text balloons available to search through are filtered by the choices under Filters

You can further filter the list by searching on the balloon text.

Click the entry in the ‘Find Text Balloons’ list to bring that text balloon into view. The text balloon and the pointer will also be highlighted for you.


By default if you click on an entry in the list, the drawing will pan to bring the pointer tip into view (i.e the thing being pointed at).

Similarly if you click on a text balloon or point on the drawing, this will highlight the entry in the Find text Balloons list.

You can click on the blue icon to open a new tab to look at the record for a specific item. 

If the text balloon was linked to a subform (e.g. a scoped item on a survey, or a defect on an Inspection) then the survey will open and the inspection will scroll to the specific feature.


Drawing Settings

Credits

Floorplans shown are courtesy of Canterbury District Health Board.


    • Related Articles

    • Set up a Work Package for your Project

      Checklist Here are the things you need to check before you set up a new Work Package to hold the work for your site: Staff Are the staff you want to use added to your organisation? Have you added Monitors (outside observers) ? Do you need to add a ...
    • Using the Technical Support Tab on Work Packages

      The Technical Support Tab on a Work Package shows all of the Technical Support drawing sets and drawings that have been loaded for a Work Package. This is found at the top of your Work Package if Technical Support drawings have been used. For ...
    • Work Package Summary Reports

      Work Package Summary Reports are intended to produce a report for a collection of inspections in a Work Package. These are selected by using filters. For more information about using filters, please read Using Insection Filters on the Hub You could ...
    • Life Cycle of a Work Package

      A Work Package can represent a site, a type of work, or a period of time. However you define how to use your Work Packages, they have different states of existence. Workpackages can be Draft Active Archived On Hold Draft Work Packages Work Packages ...
    • Different Branding on a Work Package

      For special projects or key clients, you can swap out your usual logo and load in a different one—right inside the work package. It’s a simple way to tailor your reports for this project to have a different Brand Name and Logo. With Clarinspect you ...